Client Name
Production Park
Date
18th June 2026
Client Location
Pontefract
Duration
3 days removal
Workers
Engineers Rob Sowerby, Robert Moore
Job
Music industry
Product / Title
1 x Twin beam crane fitted with a Clayton crab unit
Safe working load
10,000 kg
Span
13.5 meters
Manufacturer
Cobal Cranes
Crane Type
Twin beam
Height of lift
5 metres
Hoist type
Wire rope hoist unit
Hoist speed
Dual
Cross travel speed
Dual (Inverted)
Long travel speed
Dual (Inverted)
Control
Pendant
Radio control
No
Environment
Indoor normal use
Finish
Yellow gloss to BSOE851
Steel work
The steelwork consisted of 11 columns and 7 tracks at 7 – 10 metre bay centres giving the customer a total length of 30 metre track length
Conductor System
The bus bar system that feeds the crane was 30 meters long and come complete with mounting brackets and one set of current carrying collectors. The system is a new four bar finger proof one.
Dispatch/Delivery/
Was removed on the planned date as requested,
Complications/
Nil
Customer Feedback
E-Mail sent from site
Customer very happy with the speed of the removal, as this is a new building for him and it speeds up his own production